Report on the River and Harbor [appropriation] Bill [1916] (H.R. 20189)

¾ÕÇ¥Áö
U.S. Government Printing Office, 1915 - 342ÆäÀÌÁö

µµ¼­ º»¹®¿¡¼­

¼±ÅÃµÈ ÆäÀÌÁö

ÀÚÁÖ ³ª¿À´Â ´Ü¾î ¹× ±¸¹®

Àαâ Àο뱸

13 ÆäÀÌÁö - That the following sums are appropriated, out of any money In the Treasury not otherwise appropriated, to be immediately available and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers...
300 ÆäÀÌÁö - Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
300 ÆäÀÌÁö - QChief of Engineers, United States Army, for nineteen hundred and seven, pages twenty-two hundred and sixty-two to twenty-two hundred and...
61 ÆäÀÌÁö - NY, for a distance of about 4 miles, had a natural depth varying from 12£ feet at the mouth to 4 feet at the head of navigation. The original project, adopted in 1880 and modified in 1884, provided for a channel 240 feet wide and 21 feet deep from the mouth to the Vernon Avenue Bridge, thence to the head of navigation on both branches for channels decreasing from 175 to 100 feet in width and from 18 to 10 feet in depth.
272 ÆäÀÌÁö - Continuing improvement, two million dollars, which sum shall be expended, under the direction of the Secretary of War, in accordance with the plans, specifications, and recommendations of the Mississippi River Commission, as approved by the Chief of Engineers...
63 ÆäÀÌÁö - ... as may be recommended by the Chief of Engineers and approved by the Secretary of War.
53 ÆäÀÌÁö - Engineers for 1895, page 3213 et seq., and as subsequently modified is: First, to build an east breakwater 1,435 feet long, at an estimated cost of $197,000 (acts of March 3, 1895, and June 3, 1896) ; second, to narrow the breach made in the outer breakwater in 1884 from 175 to about 75 feet, at an estimated cost of $18,500; third, to widen and deepen the inner harbor in the mouth of the Oswego River and -to extend the deep-water area farther upstream by rock excavation. There are...
115 ÆäÀÌÁö - The original project, adopted in 1880, contemplated providing an outlet for the river into Winyah Bay by constructing a canal from the river through Mosquito Creek into the bay. On this project there was expended $99,750. The present project, adopted in 1889, contemplates providing a more satisfactory outlet into the bay by cutting a canal 70 feet wide and 6 feet deep at mean low water from the Estherville plantation to Minim Creek and for snagging the entire river. The estimated cost is $350,000,...
21 ÆäÀÌÁö - Of the latter amount, 108,686 tons were reshipped to points on the Merrimac and Powow Rivers. It is reported that the improvement made has reduced freight rates 25 cents per ton, and that if the projected depth of 17 feet at mean low water be obtained over the outer bar it would still further reduce the freight rates 15 to 25 cents per ton. The...
120 ÆäÀÌÁö - ... the navigable channel throughout the entrance to St. Simons Sound, and up Brunswick River to Brunswick Point) channels having a depth of 30 feet at mean high water, with widths varying from 150 feet in Academy Creek to 400 feet across the outer bar, to be accomplished mainly by dredging; but the extension of the existing training wall in East River and the construction of two spur dikes is also authorized. The estimated cost of the work is $496,650, with a yearly cost of maintenance not exceeding...