The Strains in Framed Structures, with Numerous Practical Applications to Cranes, Bridge, Roof and Suspension Trusses, Braced Arches, Pivot and Draw Spans, Continuous Girders, Etc: Also, Determination of Dimensions and Designing of Details, Specifications and Contracts, Complete Designs and Working DrawingsJ. Wiley & sons, 1883 - 390페이지 |
목차
34 | |
39 | |
44 | |
51 | |
55 | |
57 | |
62 | |
68 | |
75 | |
78 | |
81 | |
88 | |
91 | |
94 | |
101 | |
104 | |
107 | |
114 | |
119 | |
124 | |
128 | |
132 | |
133 | |
134 | |
142 | |
149 | |
155 | |
161 | |
167 | |
209 | |
213 | |
219 | |
226 | |
233 | |
244 | |
251 | |
256 | |
258 | |
263 | |
265 | |
274 | |
280 | |
287 | |
296 | |
298 | |
305 | |
312 | |
313 | |
328 | |
335 | |
342 | |
343 | |
352 | |
358 | |
371 | |
372 | |
기타 출판본 - 모두 보기
자주 나오는 단어 및 구문
33 tons acting algebraic sum angle apex load b₁ Batter Braces Bolts bridge C₁ C₂ cable calculation cause centre of gravity centre of moments coefficient compression continuous girder counterbraced cross section curve d₁ dead load strains deflection diagonal direction distance easily found equal equation equilibrium polygon factor of safety feet find the strains Floor Beams foot force polygon formulæ give given greatest Hence horizontal intersection Lateral Struts left end lever arm live load locomotive excess lower flanges M₁ M₂ maximum strains method method of moments moment of inertia negative shear ordinate outer forces P₁ P₂ panel parabola parallel pieces Plates positive shear posts R₁ radius of gyration reaction resultant rivets S₁ S₂ shown in Fig span square inch stress Stringers tension truss uniform load upper flange V₁ values vertical Washers weight wrought iron zero
인기 인용구
372 페이지 - ... our heirs, executors and administrators firmly by these presents. Sealed with our seals. Dated the day of in the year of our Lord one thousand eight hundred and...
371 페이지 - ... due notice thereof in writing, served personally upon or left 23 at the shop, office, or usual place of abode, or with the agent of the said 24 party of the second part, and the said party of the second part...
371 페이지 - Boston, for or on account of any injuries or damages received or sustained by any party or parties, by or from the said Contractor, his servants or agents...
371 페이지 - Contractor, his servants or agents, in the construction of said work, or by or in consequence of any negligence in guarding the same, or any improper materials used in its construction, or by or on account of any act or omission of the said Contractor, or his agents...
371 페이지 - ... all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen obstructions or difficulties which may be encountered in the prosecution of the same...
364 페이지 - ... may deem proper, to inspect the materials to be furnished, and the work to be done under this agreement ; and to see that the same strictly correspond with the specifications hereinafter set forth.
371 페이지 - ... under and by virtue of this agreement or any part thereof, and in case such expense is less than the sum which would have been payable under this contract, if the same had been completed by said contractor, then the said party of the second part shall be entitled to receive the difference...
258 페이지 - ... the square of the distance of its centre of gravity from the general neutral axis.
371 페이지 - ... due, to the said contractor, under and by virtue of this agreement, or any part thereof; and in case such expense is less than the sum which would have been payable under this contract if the same had...
371 페이지 - ... to procure other materials for the completion of the same, and to charge the expense of said labor and materials to the...