페이지 이미지
PDF
ePub
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small]

33

Naval Complex, Great Lakes/Glenview, Illinois, three hundred fifty units.

Naval Complex, New Orleans, Louisiana, one

hundred units.

Naval Air Station, Meridian, Mississippi, two

hundred units.

Naval Air Station, Lakehurst, New Jersey, two hundred units.

Naval Complex, Newport, Rhode Island, one hundred fifty units.

Naval Complex, Charleston, South Carolina, two hundred units.

Naval Complex, Norfolk, Virginia, six hundred units, and additional real estate.

Naval Security Group Activity, Galeta Island, Canal Zone, twenty units.

Naval Complex, Guam, Marianas Islands, two hundred thirty units.

units.

Naval Air Station, Bermuda, two hundred fifty

(3) The Department of the Air Force, three thousand one hundred sixty-eight units, $76,024,000:

Maxwell/Gunter Air Force Bases, Alabama, two hundred units.

35

1 SEC. 502. Authorization for the construction of family 2 housing provided in this Act shall be subject, under such 3 regulations as the Secretary of Defense may prescribe, to 4 the following limitations on cost, which shall include shades, 5 screens, ranges, refrigerators, and all other installed equip6 ment and fixtures:

7 (a) The average unit cost for each military department 8 for all units of family housing constructed in the United States 9 (other than Hawaii and Alaska) shall not exceed $24,000 10 including the cost of the family unit and the proportionate costs of site preparation and installation of utilities.

11

12 (b) No family housing unit in the area specified in sub13 section (a) shall be constructed at a total cost exceeding 14 $42,000 including the cost of the family unit and the pro15 portionate costs of site preparation and installation of 16 utilities.

17

(c) When family housing units are constructed in areas 18 other than that specified in subsection (a) the average cost 19 of all such units shall not exceed $33,500 and in no event 20 shall the cost of any unit exceed $42,000. The cost limita21 tions of this subsection shall include the cost of the family 22 unit and the proportionate costs of site preparation and instal23 lation of utilities.

24

SEC. 503. Notwithstanding the limitations contained in

25 prior military construction authorization Acts on cost of

36

1 construction of family housing, the limitations contained in 2 section 502 of this Act shall apply to all prior authorizations 3 for construction of family housing not heretofore repealed 4 and for which construction contracts have not been executed 5 by date of enactment of this Act.

6

SEC. 504. The Secretary of Defense, or his designee, is

7 authorized to accomplish alterations, additions, expansions

8

or extensions not otherwise authorized by law, to existing 9 public quarters at a cost not to exceed—

10

11

12

13

(1) for the Department of the Army, $22,511,000.

(2) for the Department of the Navy, $9,121,000.

(3) for the Department of the Air Force, $11,955,000. SEC. 505. Notwithstanding the limitations contained in 14 section 502 of this Act, the Secretary of Defense, or his

15

designee, is authorized to construct or otherwise acquire, 16 four family housing units in Brazil at a total cost not to 17 exceed $215,000. This authority shall include the authority

18

19

20

21

225

23

to acquire lands and interests in land.

SEC. 506. Notwithstanding the provisions of sections 4774, 7574, and 9774 of title 10, United States Code,

within the authority provided in section 501 (a) (2) for the

construction of family housing units at the Naval Complex,

Washington, District of Columbia, four units of family hous24 ing may be constructed at Fort Myer, Virginia, with a

25

maximum net floor area limitation of 1,670 square feet per

[ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors][ocr errors]

10 biting the eff the family m and the pr

11

12

existe é sine preparative and installation of utilities 5) No family basing unit in the area spec 13 scion (a) shall be constructed at a total co 14 $42,000 including the cost of the family uni 15 portionate costs of site preparation and 16 utilities.

17

(c) When family housing units are cons 18 other than that specified in subsection (a) t 19 of all such units shall not exceed $33,500 20 shall the cost of any unit exceed $42.000, 21 tions of this subsection shall include the 22 unit and the proportionate costs of site prep 23 lation of utilities.

24

SEC. 503. Notwithstanding the limitati

25 prior military construction authorization

« 이전계속 »