ÆäÀÌÁö À̹ÌÁö
PDF
ePub

5. Enlarge mains of sanitary sewers.

6. Install experimental sewage-treatment plant.

7. Tunnel West Mountain for relief of drainage system.

8. Enlarge arch below point of intersection with tunnel.

9. Extend arch to South Border Street.

10. Extend and increase number of lateral drains and catch basins. 11. Place concrete bottom in Park Avenue arch.

12. Enlarge approaches to arch and tunnel.

In conclusion, I desire to say that if all the recommendations enumerated above are executed, I feel that the defects complained of will be effectually remedied.

Respectfully submitted.

ATHENS, GA., January 11, 1913.

J. W. BARNETT,
Consulting Engineer.

[graphic][subsumed][ocr errors][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][subsumed]
[graphic][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][merged small][ocr errors][ocr errors][subsumed][subsumed][subsumed][subsumed][graphic]
« ÀÌÀü°è¼Ó »