Public Works Appropriations, 1964: Hearings Before the Subcommittee of the Committee on Appropriations, United States Senate, Eighty-eighth Congress, First Session, on H.R. 9140, Making Appropriations for Civil Functions Administered by the Department of the Army, Certain Agencies of the Department of the Interior, the Atomic Energy Commission, the Tennessee Valley Authority, and Certain Study Commissions, for the Fiscal Year Ending June 30, 1964, and for Other Purposes, 10권

앞표지
U.S. Government Printing Office, 1963 - 3328페이지

도서 본문에서

자주 나오는 단어 및 구문

인기 인용구

732 페이지 - Congress completes action before the end of the first period of 45 calendar days of continuous session of the Congress after the date on which the President's message is received by the Congress ; (4) "impoundment resolution...
700 페이지 - State or local interests give reasonable assurances, and there is reasonable evidence, that such demands for the use of such storage will be made within a period of time which will permit paying out the costs allocated to water supply within the life of the project...
143 페이지 - Reservoirs; subject to the condition that for each local flood protection project, no expenditures will be made until local interests give assurances satisfactory to the Secretary of the Army that they will: (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project; (b) hold and save the United States free from damages...
848 페이지 - Army of the requirements of local cooperation, unless said interests shall within said time furnish assurances satisfactory to the Secretary of the Army that the required cooperation will be furnished.
295 페이지 - Reexamination of projects in the "deferred" category The project, authorized by the 1938 Flood Control Act, provides for the protection of approximately 33,000 acres of agricultural lands against a flood which would be expected to occur on an average of seven times in each 100-year period. The protection works, if constructed according to present plan, would consist of 21.6 miles of earth levee and other necessary appurtenances.
366 페이지 - The proposed reservoir system, acting as units of the Ohio River comprehensive system, will effect significant reduction of all Ohio River floods in the 30-mile reach. The storage provided by the system will be effective to a lesser extent in reducing flood stages in other downstream areas along the Ohio River.
450 페이지 - JUSTIFICATION The project is a unit of the comprehensive plan for flood control on the West Branch Susquehanna River.
533 페이지 - The project would prevent $31,800,000 and $30,130,000 of these damages, respectively. This represents practically complete protection for 80 percent of the area flooded during past hurricanes in the New BedfordFairhaven area, and a reduction of 97 percent of the losses due to the record hurricane of 1938.
352 페이지 - Reservoir project is a unit of the comprehensive plan for flood control and other purposes in the Ohio River Basin...
413 페이지 - The Tocks Island project is the largest and most important of the projects that are designed to augment and control the waters of the Delaware River. This project...

도서 문헌정보