Annual Report of the Secretary of WarU.S. Government Printing Office, 1885 |
도서 본문에서
100개의 결과 중 1 - 5개
55 페이지
... depth to this channel , and recommends that the proposed increase of depth be , for the present , abandoned . The tidal rise being 17 to 18 feet , it may be doubted whether the advan- tage of an increase of depth from 12 feet to 15 feet ...
... depth to this channel , and recommends that the proposed increase of depth be , for the present , abandoned . The tidal rise being 17 to 18 feet , it may be doubted whether the advan- tage of an increase of depth from 12 feet to 15 feet ...
71 페이지
... depth of 10 feet at mean low water . No work was done in the lower part of the harbor under this project . Long Beach , of which a large portion was originally submerged at low water , was raised above high - water storm tides , except ...
... depth of 10 feet at mean low water . No work was done in the lower part of the harbor under this project . Long Beach , of which a large portion was originally submerged at low water , was raised above high - water storm tides , except ...
74 페이지
... depth was but 4 feet , and Bulkhead Rock , with but 7 to 8 feet of water upon it at low water , with deep water around it , was a dangerous obstruction between Pawtuxet Shoal and Field's Point . There was expended between 1852 and the ...
... depth was but 4 feet , and Bulkhead Rock , with but 7 to 8 feet of water upon it at low water , with deep water around it , was a dangerous obstruction between Pawtuxet Shoal and Field's Point . There was expended between 1852 and the ...
76 페이지
... depth of 15 feet at mean low water in the latter work was about 2.75 acres , and at the end of the fiscal year this work was still in progress . With the available remainder of the appropriation of July 5 , 1884 , the removal of the ...
... depth of 15 feet at mean low water in the latter work was about 2.75 acres , and at the end of the fiscal year this work was still in progress . With the available remainder of the appropriation of July 5 , 1884 , the removal of the ...
78 페이지
... depth limited the navi- gation of Pawcatuck River . The project of 1878 for the improvement of the bay provided for a channel 200 feet wide and 7 feet deep at mean low water , extending from the entrance to the bay to the mouth of the ...
... depth limited the navi- gation of Pawcatuck River . The project of 1878 for the improvement of the bay provided for a channel 200 feet wide and 7 feet deep at mean low water , extending from the entrance to the bay to the mouth of the ...
목차
3 | |
6 | |
51 | |
60 | |
70 | |
86 | |
96 | |
98 | |
357 | |
363 | |
369 | |
371 | |
374 | |
377 | |
379 | |
383 | |
109 | |
117 | |
139 | |
143 | |
153 | |
164 | |
167 | |
179 | |
180 | |
193 | |
207 | |
214 | |
222 | |
226 | |
229 | |
232 | |
243 | |
249 | |
252 | |
258 | |
265 | |
266 | |
273 | |
281 | |
284 | |
289 | |
292 | |
295 | |
307 | |
313 | |
314 | |
324 | |
331 | |
333 | |
344 | |
349 | |
352 | |
391 | |
401 | |
421 | |
422 | |
427 | |
457 | |
461 | |
474 | |
493 | |
499 | |
537 | |
543 | |
559 | |
569 | |
580 | |
596 | |
616 | |
625 | |
631 | |
638 | |
648 | |
670 | |
697 | |
715 | |
737 | |
743 | |
791 | |
797 | |
840 | |
855 | |
864 | |
877 | |
기타 출판본 - 모두 보기
자주 나오는 단어 및 구문
00 Submitted 100 feet wide 12 feet 1887 Submitted 60 feet act approved July act of July adopted amount available amount expended appropriated by act appropriation asked battery Board of Engineers breakwater Bridge casemates Chief of Engineers commenced completion of existing compliance with requirements construction Corps of Engineers Corps of Engineers.-This cubic yards DEFENSES Delaware River dike dredging ending June 30 entrance estimated cost excavation exclusive of outstanding existing project expended during fiscal expended in fiscal expended to June feet at low feet at mean feet deep feet long fiscal year ending harbor acts harbor of refuge Island jetty last fiscal Lieut mean low water miles Mississippi River mouth navigation obstructions outstanding liabilities July pier profitably expended removal repairs required for completion requirements of section riprap river and harbor Rock Secretary of War shoals snags Submitted in compliance survey tion vessels wharf width Willets Point