Amount expended during the fiscal year ending June 30, 1874..

Amount available July 1, 1874.....

Amount required for the fiscal year ending June 30, 1876, (as revised in this Office).....

(See Appendix C 1.)

$12, 178 89

12,387 62

26,000 00

2. Manistee Harbor, Michigan.-Three hundred and fifty feet of inside revetment have been built here, after cutting off a sharp bend in the river, on the south side.

During the next year 355 feet of revetment will be built on the north side, facing a sand-bank which is much exposed to wash to the detri ment of the channel; also 140 feet of revetment on the south side in continuation of the work of last season.

To carry the piers into the lake to the depth of 16 feet water will require the extension of the north and south piers 650 and 750 feet, respectively, or the addition of 28 cribs, each 50 feet long; which, at $4,000 each, will amount to $112,000; of which sum $50,000 can be profitably expended during the next fiscal year.

Balance in Treasury of United States July 1, 1873..
Deduct amount expended last fiscal year.

Amount appropriated by act approved June 23, 1874..

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876....

(See Appendix C 2.)

$15,000 87 3,313 00

10,000 00

10,945 74

10,742 13

50,000 00

3. Ludington Harbor, Michigan.-Six 50-foot cribs were placed in extending south pier 300 feet. During the winter the outer crib lightened and rolled into the channel, leaving the pier extension 250 feet for the year's work.

During this season it is proposed to remove the old slab-revetment and sand-bank on the south side, revetting the face exposed; and to replace the crib mentioned above.

Ten thousand dollars is thought by the officer in charge to be necessary to dredge the channel and complete the improvements for some time to come.

Balance in Treasury of United States July 1, 1873...
Amount in hands of officer and subject to his check

Amount appropriated by act approved June 23, 1874..

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874...........

Amount required for the fiscal year ending June 30, 1876....
(See Appendix C 3.)

[blocks in formation]

4. Pentwater Harbor, Michigan.-The top timbers and entire filling of the 300 feet of revetment left incomplete at date of last report have been finished. Two cribs (100 feet) were placed in extension of north pier, and the superstructure built over them. Some necessary repairs will also be made this season to the filling at several places in both piers.

No appropriation is asked.

Balance in Treasury of United States July 1, 1873..

Amount in hands of officer and subject to his check..

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874..

(See Appendix C 4.)

$20,000 00

10,003 55

23,639 51

6,364 04

5. White River Harbor, Michigan.-During the last fiscal year the work at this harbor has been limited to making repairs, filling piers with brush, slabs, and stone ballast.

The present year the south pier will be extended 50 feet, (1 crib,) and slabs and stone will be added to the filling in the old work, while a por tion of the appropriation will be held over for dredging the channel, should such contingency occur.

To carry out the south pier into 16 feet water and the north pier into 11 feet, which is requisite to secure a permanent improvement, will cost $44,525.60, to which should be added $5,000 for dredging.

Balance in Treasury of United States July 1, 1873..
Deduct amount expended last fiscal year.

Amount appropriated by act approved June 23, 1874..

Amount expended during the fiscal year ending June 30, 1874..

Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876..

(See Appendix C 5.)

$7,003 53

1,907 91

10,000 00

4,449 73

10,645 89

49,500 00

6. Muskegon Harbor, Michigan.-No appropriation was made for this harbor last year.

The work under a former appropriation, 350 feet of revetment on south side and 250 feet on north side, was completed September 30, 1873.

With the $10,000 appropriated by act of June 23, 1874, the south pier will be extended 50 feet, (1 crib,) and about 135 feet of pile-revetment will be added to the north side, eastward of the Government work, where the old slab-pier was burned and where a breach threatened.

Forty-six thousand dollars is asked to continue pier-extension, which the large commerce of this place demands.

Amount in hands of officer and subject to his check..

Amount appropriated by act approved June 23, 1874.

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874......

Amount required for the fiscal year ending June 30, 1876.

(See Appendix C 6.)

$9,778 40

10,000 00

9,698 43

10,079 97

46,000 00

7. Grand Haven Harbor, Michigan.-Early in the past year some very needed repairs were put upon the south pier. Two thousand one hundred feet of pile-work for north pier and revetment was put under contract and nearly completed.

The present year the north pier will be extended 300 feet, (six cribs)— probably as far as it will need to go for some time to come-and 500 feet of pile-revetment will be constructed on the south side eastward of the former work.

The harbor is by far the best on this shore. It is 400 feet wide, with 20 feet of water.

No appropriation is required for the next fiscal year.

Balance in Treasury of United States July 1, 1873..

Amount in hands of officer and subject to his check.

$75,000 00

Amount appropriated by act approved June 23, 1874.

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874..

(See Appendix C 7.)

6,305 76

50,000 00

51,595 20

79,710 56

8. Black Lake Harbor, Michigan.-Four hundred feet of pile-revetment have been constructed on the south side during the year, and much of the filling of the old work renewed.

During the present season the piers will be extended, the south 100 feet and the north 50 feet, possibly 100 feet.

To secure permanency to the present good condition of this harbor, the piers should be extended to 15 feet of water, and $35,000 is asked to continue this work of extension.

Balance in Treasury of United States July 1, 1873..

Amount in hands of officer and subject to his check..

$12,007 35

1,042 38

Amonnt appropriated by act approved June 23, 1874..
Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876.

(See Appendix C 8.)

[blocks in formation]

9. Saugatuck Harbor, Michigan.-The contract made under the last appropriation was annulled for cause, and the work of building 400 feet of north pier is progressing by hired labor. It is about one-half completed. A wing-dam 243 feet long was built in the river to direct the current. It is proving of great benefit, apparently removing the agency which tended to undermine the revetment, and is depositing material where it is so much needed, and where the revetment has almost given way. This year it is intended to build about 400 feet of pile-work, connecting the north pier with the shore.

Fifteen thousand dollars is asked to continue the improvements. Balance in Treasury of United States July 1, 1873..

Deduct amount expended last fiscal year

Amount appropriated by act approved June 23, 1874..

Amount expended during the fiscal year ending June 30, 1874..

Amount available July 1, 1874

Amount required for the fiscal year ending June 30, 1876.

(See Appendix C 9.)

$20,000 00

906 18

10,000 00

13,818 08

15, 275 74

15,000 00

10. South Haven Harbor, Michigan.-During the past year there were sunk in extension of the north pier two cribs, (50 feet each,) and in extension of the south pier one crib.

The coming season the superstructure will be completed, and about 300 feet of revetment on north side will be built.

To continue the improvement will require $40,000.

Balance in Treasury of United States July 1, 1873.
Amount in hands of officer and subject to his check..
Amount appropriated by act approved June 23, 1874

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876..
(See Appendix C 10.)

$20,000 00

8,280 50 10,000 00

26, 190 52

12,089 98 40,000 00

11. Saint Joseph Harbor, Michigan.-No appropriation was made last year, and, beyond a survey made in June, nothing has been done during the year.

The appropriation of June 23, 1874, will be applied to the filling and ballasting of the present piers.

Amount in hands of officer and subject to his check..

No appropriation is asked.

$155 33

Amount appropriated by act approved June 23, 1874.

2,000 00

Amount expended during the fiscal year ending June 30, 1874.

34 76

Amount available July 1, 1874..

2,120 57

(See Appendix C 11.)

ENLARGEMENT OF ST. MARY'S FALLS CANAL, AND IMPROVEMENT OF THE ST. MARY'S RIVER-HARBORS ON LAKES HURON AND ST. CLAIR— ST. CLAIR FLATS CANAL AND DETROIT RIVER.

Officer in charge, Maj. G. Weitzel, Corps of Engineers, with Capt. A. N. Lee, Corps of Engineers, under his immediate orders.

1. St. Mary's Falls Canal.-During the year the purchase of land required for the enlargement of the canal has been completed. The winter was very favorable for work, and much has been accomplished. The excavation for the deepening and widening of the greater portion of the

old prism and the pier-revetment for the side of the same were nearly completed, as also the lock-pit for the new lock.

It is extremely important and pressing that there should be no delay in constructing the new locks, as if anything should happen to prevent the use of the old ones, the effect on commerce would be ruinous.

The original estimate of the cost of these locks was $1,159,330. Of this sum there remains $560,000 to be appropriated, and at least $300,000 of this should be made available for the fiscal year ending June 30, 1876.

Balance in Treasury of United States July 1, 1873
Amount in hands of officer and subject to his check, (including $20,472.52

$524,038 00

percentage due on contracts not yet completed)

Amount appropriated by act approved June 23, 1874'

Amount expended during the fiscal year ending June 30, 1874

118,584 59

200, 000 00

261,599 24

534,062 81

Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876

(See Appendix D 1.)

300,000 00

2. St. Mary's River, Michigan.-A survey of the Hay Lake Channel has been made, to form an estimate of the cost of its improvement. By this channel the distance to the Sault St. Mary's Canal is shortened eleven miles, and vessels would be enabled to navigate it at all hours, the Lake St. George Channel, now used, being only practicable by day. The opening of this channel, however, involves the serious expense of rock-excavation through West Neebish Rapids.

(See Appendix D 2.)

3. Cheboygan Harbor, Michigan.-The operations here have consisted in continuing the dredging of a channel 13 feet deep across the bar, under the appropriation of March 3, 1873. Seventy-six thousand nine hundred and fifty-five cubic yards were dredged during the fiscal year. The work already done has been of much benefit to the general commerce of the lakes.

The officer in charge submits an estimate of $60,000 for the next fiscal year.

Balance in Treasury of United States July 1, 1873

$15,000 00

Amount in hands of officer and subject to his check, (including $773.29

percentage due on contracts not yet completed)

6,984 80

Amount appropriated by act approved June 23, 1874.

15,000 00

Amount expended during the fiscal year ending June 30, 1874.

21,211 51

Amount available July 1, 1874

Amount required for the fiscal year ending June 30, 1876, (as revised in this Office).

15,000 00

30,000 00

(See Appendix D 3.)

4. Mouth of Au Sable River, Michigan.-The operations during the year consisted in dredging a channel 10 feet in depth across the bar of the river and keeping existing structures in repair.

Attention is again called by the officer in charge to the encroachments upon the channel of the river by private parties, which tend to neutralize the good effects of the Government work.

Balance in Treasury of United States July 1, 1873........
Amount in hands of officer and subject to his check

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874..

(See Appendix D 4.)

$4,980 50

5,039 40

6,842 25

3,177 65

5. Saginaw River, Michigan.-The main obstruction in this river is the Carrolton Bar, where it is proposed to contine the water by means of a double row of piling, to be driven on the eastern side of the river. The

other obstructions are lesser bars, which it is believed may be removed by dredging. The cost of the whole improvement is estimated at $56,000. The appropriation of June 23, 1874, will be applied to the commencement of this work.

The location of certain private docks have undoubtedly had an injurious effect upon this stream, and the officer in charge of this improvement calls attention to the necessity of such legislation as will enable those in charge of river-improvements to prevent the injuries complained of.

Balance ín Treasury of United States July 1, 1873.
Amount appropriated by act approved June 23, 1874
Amount available July 1, 1874..

Amount required for the fiscal year ending June 30, 1876.

(See Appendixes D 5 and D 6.)

$292 89 15,000 00 15, 292 89 45,000 00

6. Harbor of Refuge, Lake Huron.-During the fiscal year four cribs of the breakwater were placed in position and made secure, and all preliminary arrangements for prosecuting the work vigorously made, and all the necessary boats, derricks, dredges, and machinery furnished. The officer in charge reports the work so far done as good, with fair prospects for good progress in future.

Balance in Treasury of United States July 1, 1873...
Amount in hands of officer and subject to his check
Amount appropriated by act approved June 23, 1874

$242,800 00

Amount expended during the fiscal year ending June 30, 1874.
Amount available July 1, 1874

Amount required for the fiscal year ending June 30, 1876.....
(See Appendix D 7.)

[blocks in formation]

7. Saint Clair Flats Ship-Canal.-The work of deepening this canal to 16 feet, 200 feet wide, is nearly completed; 194,657 cubic yards of material were dredged during the year, and it is expected that the whole amount required will be dredged for less than the estimate. No further appropriation is required.

Balance in Treasury of United States July 1, 1873..
Amount in hands of officer and subject to his check

Amount expended during the fiscal year ending June 30, 1874.

Amount available July 1, 1874

(See Appendix D 8.)

$100,000 00

547 19 45, 153 53 55,393 66

8. Mouth of Black River, St. Clair River, Michigan.-The bar at the mouth of Black River has been dredged to the depth of 13 feet throughout, and two cuts of 15 feet in depth have been completed. The appropriation of June 23, 1874, will be applied to the continuation of this dredging to a depth of 15 feet.

Estimate submitted by the officer in charge for continuing the work, $15,000.

Balance in Treasury of United States July 1, 1873

$15,000 00

Amount in hands of officer and subject to his check, (including $1,377.95.

percentage due on contracts not yet completed)..

1,377 95

Amount appropriated by act approved June 23, 1874.

15,000 00

Amount expended during fiscal year ending June 30, 1874

15,000 00

Amount available July 1, 1874

Amount required for the fiscal year ending June 30, 1876, (as revised in this Office)...

15,000 CO

10,000 00

(See Appendix D 9.)

9. Improvement of Detroit River.-The act of June 23, 1874, appropriated $25,000 for removing bowlders and rocks from Detroit River. At the close of the fiscal year instructions had been given for the expendi ture of this appropriation.