" The east breakwater was in a very dilapidated condition, more than half of it having been destroyed. Operations were resumed in 1872, dredging the channel between the piers and repairing the east breakwater, and by the close of the fiscal year ending... "
Annual Reports of the War Department - 252 페이지
저자: United States. War Department - 1874
전체보기 - 도서 정보

Report of the Chief of Engineers U.S. Army, 파트 1

United States. Army. Corps of Engineers - 1874 - 946 페이지
...in 1872, dredging the channel between the piers and repairing the east breakwater, and by the close of the fiscal year ending June 30, 1873, 433 feet...work was well advanced on July 1, and by September 21, 1873, was completed, and a clear channel of that width and depth existed between the piers. In...
전체보기 - 도서 정보

Congressional Serial Set

1874 - 974 페이지
...in 1872, dredging the channel between the piers and repairing the east breakwater, and by the close of the fiscal year ending June 30, 1873, 433 feet...work was well advanced on July 1, and by September 21, 1873, was completed, and a clear channel of that width and depth existed between the piers. In...
전체보기 - 도서 정보

House Documents, Otherwise Publ. as Executive Documents: 13th Congress ..., 3권

United States. Congress. House - 1875 - 980 페이지
...a channel 200 feet wide and 10 feet deep nearly completed. OPERATIONS DURING THE FISCAL YEAR. Tlie opening of the fiscal year found operations in progress,...dredging a channel 200 feet wide under contract with E. II. French. This contract required the removal of 29,590 cubic yards, measured in position, and...
전체보기 - 도서 정보

Annual Reports of the War Department, 파트 3

United States. War Department - 1880 - 754 페이지
...15 feet was found in the channel from thence to the docks at Toledo. OPERATIONS DURINCr THE PRESENT FISCAL YEAR. The opening of the fiscal year found operations in progress nuder the contract of April 1 with Mr. EH French, dredging the channel between Toledo and the lake....
전체보기 - 도서 정보

Report of the Chief of Engineers U.S. Army

United States. Army. Corps of Engineers - 1879 - 1130 페이지
...present the harbor appears te me to be in no immediate danger of injury from a breach in the pen» sula. OPERATIONS DURING THE FISCAL YEAR. The opening of the fiscal year found operations in progress labor repairing the north pier ; 38!) linear feet of superstructure was rebuilt and a crib 10 feet...
전체보기 - 도서 정보

Report of the Chief of Engineers U.S. Army

United States. Army. Corps of Engineers - 1882 - 1072 페이지
...the new work necessary on the east side causes the increase over the estimates heretofore submitted. OPERATIONS DURING THE FISCAL YEAR. The opening of the fiscal year found work in progress, dredging the channel through the outer bar and extending the west pier. The dredging...
전체보기 - 도서 정보

Annual Report of the Secretary of War, 2권

United States. War Department - 1874 - 936 페이지
...iu 1872, dredging the channel between the piers and repairing the east breakwater, and by the close of the fiscal year ending June 30, 1873, 433 feet...work was well advanced on July 1, and by September 21, 1873, was completed, and a clear channel of that width and depth existed between the piers. In...
전체보기 - 도서 정보

Report of the Chief of Engineers U.S. Army, 파트 3

United States. Army. Corps of Engineers - 1881 - 1138 페이지
...the current does not complete this work before the piers are finished. OPERATIONS DURING THE PRESENT FISCAL YEAR. The opening of the fiscal year found operations in progress under the contract of September, 1879, prolonging both piers. Operations were continued until the middle...
전체보기 - 도서 정보

Annual Report of the Secretary of War

United States. War Department - 1882 - 1054 페이지
...will be a strong pile dike 12 feet wide. A channel 10 feet deep will be dredged between the piers. OPERATIONS DURING THE FISCAL YEAR. The opening of the fiscal year found work in progress under the contracts of .Salmon & Nares, dated August 24, 1880, and of John Stang,...
전체보기 - 도서 정보

Congressional Serial Set

1883 - 1056 페이지
...will be a strong pile dike 12 feet wide. A channel 10 feet deep will be dredged between the piers. OPERATIONS DURING THE FISCAL YEAR. The opening of the fiscal year found work in progress under the con tracts of Salmon & Nares, dated August 24, 1880, and of John Stang,...